LOAD OF THE MONTH: RIDGWAY TO MILWAUKEE

Impact NetworkingProjects

Ridway to Milwaukee We were tasked with moving custom brewing equipment for a new brew pub from Ridgway, CO to Milwaukee, WI. This shipment needed to get to Wisconsin asap to aid in the essential task of brewing delicious beer for the fine people of Milwaukee. As always, there were obstacles along the way. Good thing we enjoy a good … Read More

LOAD OF THE MONTH: GENERATING GREAT RESULTS

Impact NetworkingProjects

Generating Great Results. We were tasked with moving two generator engines that were shipped to our storage yard while our customer purchased an enclosure for one of them. When the enclosure was ready, we shipped the engines to Wisconsin to have the enclosure installed. Once the two generators were geared to ship, we tarped them for protection and headed for … Read More

LOAD OF THE MONTH: WE NEVER SHRINK FROM A CHALLENGE

Impact NetworkingProjects

We never shrink from a challenge. We were tasked with moving four custom designed and built wastewater treatment systems from Oregon to North Carolina. The dimensions of each of the systems were 32-0 x 11-2 x 11-10. Of course, there are always a few exciting challenges along the journey. Due to inclement weather, the shrink wrap—a critical part of safely … Read More

LOAD OF THE MONTH: TOO BIG TO FIND?

Impact NetworkingProjects

Instead of looking for the needle, we were looking for the haystack. We were tasked with delivering concrete cattle bunks loaded with 12 pieces of dunnage (loose wood, matting or material used to keep cargo in position). We began our journey at The Concrete Works in Wasola, MO with the end destination of Lee, FL. Of course, as with any … Read More

LOAD OF THE MONTH: SHIPPING 19 MAMBAS IN 2 DAYS

Impact NetworkingProjects

Ship 19 Mambas in 3 weeks? How about 2 days? We were tasked with delivering 19 Mamba’s—U.S. military vehicles used for supporting government personnel overseas—from North Carolina to Delaware to be shipped to Africa. The dimensions of each Mamba are 20’7”L x 8’4”W x 9’4”H and weigh 25,353lbs. Each needed its own trailer equipped with ramps to load and offload. … Read More

LOAD OF THE MONTH: AROUND THE WORLD ADVENTURES WITH ZMAC

Impact NetworkingProjects

Anywhere in the world, ZMac has its customers covered. We were tasked with delivering specialized machinery from South Korea to Wisconsin—by way of California, the Panama Canal, through Houston then eventually Louisiana to Wisconsin. Just like any shipment, we were ready to help when unforeseen problems occurred. First, when the shipment arrived in California, the captain of the ship refused … Read More

LOAD OF THE MONTH: ANYTHING BUT SMALL POTATOES

Impact NetworkingProjects

ZMac recently delivered a massive dryer that can dry up to 50 tons of potatoes per hour – an important part of preparing potatoes to be processed and made into healthy food for dogs across the country. Our trek began in Brookfield, WI and ended successfully in Arlington, MN. Overall, the transport took about 2 weeks to complete. Due to … Read More

Stainless Steel Mirrors to Texas

Impact NetworkingProjects

  Recently we coordinated the delivery of three truckloads of crated stainless steel mirror pieces to Texas. Each truckload was 50 feet long, 11 feet 11 inches wide, and 6 feet high. The mirror pieces were then assembled into a mixed media art sculpture. The sculpture is the featured art piece in a new quad at a local university.

Tanks to New Jersey

Impact NetworkingProjects

Load of the Month - August 2018

  We coordinated the delivery of 4 tanks on two trailers to New Jersey. Each tank was 12 feet 6 inches long, 12 feet 2 inches wide, and 13 feet 9 inches high. The tanks are used at a water filtration facility as part of a well replacement project for a municipality.

Conestogas to Mexico

Impact NetworkingProjects

  Recently, we coordinated the delivery of 3 fully loaded 53′ step deck conestoga trailers to Mexico. Each trailer held several pieces that are used in the assembly process to make garbage disposals.