Load of the Month: Anything but small potatoes

ZMac recently delivered a massive dryer that can dry up to 50 tons of potatoes per hour – an important part of preparing potatoes to be processed and made into healthy food for dogs across the country.    Our trek began in Brookfield, WI and ended successfully in Arlington, MN. Overall, the transport took about 2 weeks to complete. Due … Read More

How To Build A Sphere Out Of Cubes: The Story Behind The Shipment

Story Behind The Shipment - How to Build a Sphere

We’ve shared stories about our role in transporting some really important (and big) things. Things that make a difference helping people to live, communities to build, and future generations to thrive. Frequently, though, once these important and big things are delivered and put into use, we can’t really see them again. They’re placed underground or underwater or covered in an … Read More

Prefabricated Building to Louisiana

ZMac Load of the Month December 2016 - Prefabricated Building to Louisiana

In December, we coordinated the delivery of a prefabricated building that was 60 feet 2 inches long, 14 feet wide, 13 feet 8 inches high, and 90,000 pounds. It picked up in South Dakota and delivered in Louisiana.  

Load of the Month: Pop-Up Fast Food Restaurant

ZMac Fast Food Oversized Freight

Recently, ZMac had the pleasure – and challenge – of helping a major fast food chain undertake the beginning of an innovative new project. The ZMac team was approached in April to help haul a 20,000-pound prefabricated building halfway across the country. The pop-up restaurant was the first of its kind and we were excited to have the chance to be … Read More